-
Stream Crossing Programmatic Notification Form
-
This form identifies key elements of the proposed action, but must be accompanied by sufficient additional documentation to ensure that the
proposed action fits all applicable design criteria, and that all effects to ESA-listed species and their habitats are within the range of
effects considered in the biological opinion guiding this notification process for use by the relevant agency, USACE, USFWS, or FEMA.
Located in
Projects
/
USFWS Programmatic Stream Crossing Consultation
-
Instructions for Completing Stream Crossing Programmatic Notification Form
-
This instruction guide is meant to help in completing the Stream Crossing Programmatic Notification Form *. The form is to be completed by an applicant to notify all relevant Federal agencies of the applicant’s intention to remove, install, replace or repair a stream crossing located within the areas of Maine that are important to the recovery of the Gulf of Maine Distinct Population Segment of Atlantic salmon, which is listed as endangered by the Federal Endangered Species Act (ESA). This form is part of a streamlined U.S. Army Corps of Engineers (Corps) permitting and ESA section 7 consultation process that is applicable only to stream crossing work that meets the criteria for natural and sustainable design embodied in the U.S. Forest Service’s document, Stream Simulation: An Ecological Approach to Providing Passage for Aquatic Organisms at Road-Stream Crossings,
Located in
Projects
/
USFWS Programmatic Stream Crossing Consultation
-
Sample Plan Set
-
This set of plans is meant to portray an example of final construction drawings only, and must be accompanied by sufficient additional documentation of site conditioins to satisfy the need for the Programmatic Notification Form. That
documentation would include elements such as stream profile, cross-section(s), substrate characterization, hydrology and hydaulics analysis.
Located in
Projects
/
USFWS Programmatic Stream Crossing Consultation
-
Sample Supplemental Documents
-
Examples of site maps, photographs, longitudinal profile and other supplemental material that must be submitted along with the Stream Crossing Programmatic Notification Form.
Located in
Projects
/
USFWS Programmatic Stream Crossing Consultation
-
Dam Removal to Help Restore Spawning Grounds
-
Under a bright sky here, a convoy of heavy equipment rolled onto the bed of the Penobscot River on Monday to smash the Great Works Dam, a barrier that has blocked the river for nearly two centuries.
Located in
Resources
/
Historical Archives
-
Pleasant River Paddle
-
Flat water paddling event
Located in
Calendar
-
Atlantic Salmon Refugia Identification
-
USGS/NOAA Partnership
Located in
Projects
-
ACFHP Announces FY2021 Funding Available for Habitat Conservation Projects
-
Atlantic Coastal Fish Habitat Partnership
National Fish Habitat Action Plan
habitat restoration and conservation
Funding
Located in
Opportunities
/
Funding
-
Proposal Template
-
Project format
Located in
Groups
/
…
/
IT Quarterly Meetings: Agendas and Notes
/
CMS IT Quarterly Meeting 9-17-2020
-
Hydrodam Passage Assessment Ad Hoc Committee (Smolts for Weldon)
-
Ad hoc committee proposal
Located in
Groups
/
…
/
IT Quarterly Meetings: Agendas and Notes
/
CMS IT Quarterly Meeting 9-17-2020