-
Maine Atlantic Salmon Trap Count Statistics
-
Maine Department of Marine Resources, Bureau of Sea-Run Fisheries and Habitat staff conduct routine monitoring of the abundance and status of adult Atlantic salmon and other fish species in many Maine rivers. MDMR Staff operates on the Penobscot River (Milford Dam), Androscoggin River (Brunswick Dam), and Narraguagus River (Cherryfield Dam). Brookfield Renewable Partners operates traps on the Kennebec River (Lockwood Dam), the Union River (Ellsworth Dam), The Penobscot River (Orono Dam) and at two hydroelectric projects on the Saco River (Skelton and Cataract Dams). The St. Croix Waterway Commission operates a trap at the Milltown Dam on the St. Croix River. Benton Falls Associates operates a trap on the Sebasticook River (Benton Falls Dam). Algonquin Power & Utilities Corp operates a trap on the Aroostook River (Tinker Dam). These fish counting facilities are typically operated from May through early November each year. Staff update the statewide trap catch summary weekly or more often during the peak of the fish migrations. The statewide trap catch table includes counts of sea-run salmon captured on Maine rivers and salmon removed from the river as broodstock for restocking of Maine rivers and DOES NOT include captures of aquaculture strays or captive reared adult salmon released from Federal hatcheries.
Located in
Projects
-
World Fish Migration Day
-
World Fish Migration Day is a one day global event to call attention to open rivers and migratory fish. In Maine, we have events scheduled throughout the month of May. Come celebrate with us!
Located in
Projects
-
West Branch Brook Culvert Assessment and Design - Final Report
-
Project SHARE conducted a preconstruction site assessment of the 30-00-0 road crossing of West Branch Brook. West Branch Brook is a head water tributary of the Narraguagus River. The Beddington Lake HUC 12 is the top priority focus area for Atlantic salmon restoration in the Narraguagus River. Funding for this project was provided by the Gulf of Maine Council with assistance from the U.S. Fish and Wildlife Service Maine Fishery Resources Office.
Located in
Projects
/
West Branch Brook
-
Preliminary Framework Concept: Inland fish habitat modeling for the North Atlantic Landscape Conservation Cooperative
-
Downstream Strategies is committed to a stakeholder-driven process to guide each phase of this project, we propose the following methodology as a potential template for much of the work for inland stream modeling. It is not our intention to dictate the process, but inform the NALCC stakeholders about a generalized methodology that has shown to be useful in the past, and that could be implemented for this project, should the stakeholders find that it would meet their objectives and expectations.
Located in
Projects
/
Downstream Strategies Project
/
Public working documents
-
Virginia Piedmont and Coastal Plain Updates to Northeast Habitat Map
-
This project updated the Northeast Terrestrial Habitat Map by remapping the Virginia coastal plain and piedmont. (The previous version adopted the Southeast GAP map for these regions.) This resulted in a map that is fully consistent across the 13 state Northeast region (Maine to Virginia and West Virginia).
Located in
Projects
-
Increasing Resiliency of Tidal Marsh Habitats and Species
-
This project is designed to guide decisions about where to conduct tidal marsh restoration, conservation, and management to sustain coastal ecosystems and services, including the fish and wildlife that depend upon tidal marshes, taking into account rising sea levels and other stressors.
Located in
Projects
/
North Atlantic Marsh Resiliency Projects
/
Increasing Resiliency of Tidal Marsh Habitats and Species
-
Multi-Ecosystem Projects
-
Located in
Projects
-
Projects
-
-
NALCC Technical Committee Conference Call Agenda 01/17/12
-
The agenda includes topics: results of November Steering Committee Meeting, status of contracts, annual process for identifying and refining needs and funding projects and for recommendations on additional phases of existing projects, proposal for Northeast Landscape Conservation Design, and update on information management needs assessment.
(Handout 1)
Located in
Teams
/
…
/
pdfs
/
Handouts: January 2012 Technical Committee Meeting
-
Priority Common Science Needs: Next Steps (Handout 4)
-
This is the Priority Common Science Needs: Next Steps handout for the Technical Committee meeting in January, 2012. It includes 17 topics under Common Needs, 4 under Information Management, and 2 additional needs discussed at the Albany meeting.
(Handout 4)
Located in
Teams
/
…
/
pdfs
/
Handouts: January 2012 Technical Committee Meeting