You are here: Home / Teams / Connecticut River Watershed Pilot / Connecticut River Pilot Core Team / Connecticut River Pilot Core Team Meeting 08-28-2014 / Document: Process and Decisions for Design on the Connecticut River Pilot Project

Document: Process and Decisions for Design on the Connecticut River Pilot Project

This document includes the key decisions made through August 2014 on the Connecticut River Pilot Landscape Conservation Design Project. Where available, details such as the meeting at which we reached consensus, options considered, and associated documents are included.

Publication Date: 2014

Modification Date: Thu 28 Aug 2014 09:54:09 AM

Contributors: Maritza Mallek , Scott Schwenk , Nancy McGarigal

PDF document icon CTRiver Watershed Pilot LCD Key Decisions v4.pdf — PDF document, 102 kB (105,324 bytes)

Document Actions